We had a site meeting today for the first time in two weeks and while there was quite a lot of progress to be seen in some areas, in others, chaos still seems to reign.

Site Meeting, Oct 10/13

Architect and Contractor
But brickwork has finally started and it is almost possible to see the layout of the ground floor taking place.

Brickwork up to floor level of patio.
In a nutshell, getting the site ready for building and sorting out the different levels, has been a lot more complicated and has taken a lot more time than anyone ever seems to have anticipated and as each week passes, I am more grateful that we have not yet sold our present home and so have no real time pressure.
One problem that has recently surfaced is the depth of the sewer in relation to the position of the downstairs guest toilet. I have never before given a moment’s thought to how plumbing works on sloping sites and now find myself learning all kinds of things of which I’ve previously been happily ignorant. If the sewer runs off the lowest end of a property there’s no problem, but if, as in our case, it runs off the highest point towards a connection under the street, it poses all sorts of issues I’d really rather not think about.
The original house on this plot was built just a little lower than street level. And now we understand why the guest toilet which was odd anyway, was perched up a step on a throne-like structure. It needed to be higher than the sewer outlet.
Up until now, we’ve been aiming to position our house as close to the level of the park as possible. We were hoping to have only one shallow step from the patio down onto the lawn, and from the driveway and front porch, only a very shallow step up into the entrance hall. Tracing the sewer proved problematic. The council couldn’t help. Days and days of digging by the builders, however, have eventually revealed the sewer to be – although buried far down – at a higher point than our downstairs toilet was going to be. So, at this morning’s site meeting we had to take a decision to raise the entire ground floor level of the house by two brick courses and that may still change to three. Of everyone involved in the planning, I seem to be the one least troubled by this: Knowing how the rain thunders down in Johannesburg, I was always a little concerned that we might have flooding under the front door occasionally unless the driveway drainage is absolutely and completely faultless. Also, in our present home, our patio is completely level with the lawn and many storms have left the tiles awash with water, despite our having built a special drain to avoid this. So a few steps here and there, provided they’re wide, shallow and outside, are fine with me.

I’d like a miniature version of these steps.
What isn’t fine with me is the chaotic look and feel of the site. I can’t help feeling that by now, with a little imagination, it could be better managed and today I requested that something be done about it.

Still all a bit chaotic.
While I appreciate that there is very little ‘spare’ space to play with in terms of stacking building materials etc, having everything piled on the pavement and sliding down into the road is not an option.

These need to be stacked on site.
Today I asked for the entire street frontage to be fenced off with temporary corrugated iron fencing, with a solid gate to replace the untidy blue plastic which is currently operating as an access point. Each time I visit, it has bigger and bigger holes torn in it, made, presumably by curious passers-by. And I’ve also asked for a proper board to be erected on the pavement giving the details of the contractor, engineer and architect. I’m curious to know how long this will take.

This blue plastic needs to go.