We had another site meeting today and it was not straightforward.  The ground floor level was several brick courses higher than originally planned and definitely higher than we were happy with.  We really want to avoid having a very tall house looming over a narrow stand.    We could never have anticipated that something as prosaic as a sewer would complicate our plans in this way.  After much – quite heated – discussion about various options, including storage tanks and pumps (strongly vetoed by me), moving the guest toilet to the landing level on the stairs (possibly tolerated by me but not happily), we arrived at a compromise that looks like a possibility:  With a slight alteration to the existing guest toilet area, we should be able to include two steps which will give the troublesome loo the necessary height.  We should still, hopefully, get away with having only two steps up to the front door and two steps from the patio down to the lawn.  Whoever would have thought that the smallest room in the house could give the most trouble?

So it was back to the drawing board for Bernard this afternoon and yet another meeting planned with the engineer to confirm, once and for all, that this plan will work.

Discussion taking place where the scullery will be.

Discussion taking place where the scullery will be.

 

Taken from the west end of the living room.  The 'library' will be on the right and the patio on the left.

Taken from the west end of the living room. The ‘library’ will be on the right and the patio on the left.

 

 

 

 

 

 

 

 

 

Lunch Break!

Lunch Break!

 

Now that the foundations are in place, it seems like a good time to post a copy of the ground floor layout:Phurst Ground FloorplanThis is a simplified plan but for anyone who might be confused here are some pointers:

The cottage is at the bottom of the plan.  It is positioned south of the house, on the street and has the driveway on the left.

The driveway slopes downwards and turns right into the garage which is linked to the house through a door into the laundry/mudroom.

And then there is The House.

One or two people have asked ‘what sort of house’ we’re building and also, what I meant in an earlier post when I said I wanted a ‘South African house.’  To the first question I answer that we’re building a double-storey house with an iron (tin) roof, sash windows and wooden floors.  These are the criteria I gave Bernard in a nutshell.  To which he responded, rather to my surprise, that I was describing a ‘contemporary Transvaal farmhouse.’

This was something of a revelation to me as I had not before given much thought to differences in house styles in various parts of the country.  With the exception, perhaps, of the beautiful Cape Dutch architecture in the Western Cape.  So I think I’ll have to devote a future blog post to the reasons behind this choice.

Other features I mentioned were the direct link from the house to the garage, a covered patio and lots of skylights and, if possible, a sunny bay window.   We wanted one open-plan living area and an open plan kitchen since at this stage of our lives we have no need of either a formal dining or sitting room.  I also asked for separate bathroom facilities with outside access for casual workers as I’ve found this to be a bit of an issue in other houses.  Looking at this plan, we seem to have covered all these points.   But what Bernard (our architect) doesn’t know yet is that somewhere or other, inside, outside or on the patio, there is going to have to be a swing….  I’ll break that news to him further down the line.

The foundations for the main house were poured on the 2nd of October.  This is what it looked like:

The Concrete Mixing trucks arrived at 5pm and caused just a little chaos.

The Concrete Mixing trucks arrived at 5pm and caused just a little chaos.

Pouring....

Pouring….

.....and smoothing.

…..and smoothing.

 

 

 

 

 

 

 

 

Finishing the pour under floodlights.

Finishing the pour under floodlights.

 

 

 

 

 

We had a site meeting today for the first time in two weeks and while there was quite a lot of progress to be seen in some areas, in others, chaos still seems to reign.

Site Meeting, Oct 10/13

Site Meeting, Oct 10/13

Architect and Contractor

Architect and Contractor

But brickwork has finally started and it is almost possible to see the layout of the ground floor taking place.

Brickwork up to floor level of patio.

Brickwork up to floor level of patio.

In a nutshell, getting the site ready for building and sorting out the different levels, has been a lot more complicated and has taken a lot more time than anyone ever seems to have anticipated and as each week passes, I am more grateful that we have not yet sold our present home and so have no real time pressure.

One problem that has recently surfaced is the depth of the sewer in relation to the position of the downstairs guest toilet.  I have never before given a moment’s thought to how plumbing works on sloping sites and now find myself learning all kinds of things of which I’ve previously been happily ignorant.  If the sewer runs off the lowest end of a property there’s no problem, but if, as in our case, it runs off the highest point towards a connection under the street, it poses all sorts of issues I’d really rather not think about.

The original house on this plot was built just a little lower than street level.  And now we understand why the guest toilet which was odd anyway, was perched up a step on a throne-like structure.  It needed to be higher than the sewer outlet.

Up until now, we’ve been aiming to position our house as close to the level of the park as possible.  We were hoping to have only one shallow step from the patio down onto the lawn, and from the driveway and front porch, only a very shallow step up into the entrance hall. Tracing the sewer proved problematic.  The council couldn’t help.  Days and days of digging by the builders, however, have eventually revealed the sewer to be – although buried far down – at a higher point than our downstairs toilet was going to be.  So, at this morning’s site meeting we had to take a decision to raise the entire ground floor level of the house by two brick courses and that may still change to three.  Of everyone involved in the planning, I seem to be the one least troubled by this:  Knowing how the rain thunders down in Johannesburg, I was always a little concerned that we might have flooding under the front door occasionally unless the driveway drainage is absolutely and completely faultless.  Also, in our present home, our patio is completely level with the lawn and many storms have left the tiles awash with water, despite our having built a special drain to avoid this.  So a few steps here and there, provided they’re wide, shallow and outside, are fine with me.

I'd like a miniature version of these steps.

I’d like a miniature version of these steps.

What isn’t fine with me is the chaotic look and feel of the site.  I can’t help feeling that by now, with a little imagination, it could be better managed and today I requested that something be done about it.

Still all a bit chaotic.

Still all a bit chaotic.

While I appreciate that there is very little ‘spare’ space to play with in terms of stacking building materials etc, having everything piled on the pavement and sliding down into the road is not an option.

These need to be stacked on site.

These need to be stacked on site.

Today I asked for the entire street frontage to be fenced off with temporary corrugated iron fencing, with a solid gate to replace the untidy blue plastic which is currently operating as an access point. Each time I visit, it has bigger and bigger holes torn in it, made, presumably by curious passers-by.  And I’ve also asked for a proper board to be erected on the pavement giving the details of the contractor, engineer and architect.  I’m curious to know how long this will take.

This blue plastic needs to go.

This blue plastic needs to go.